Green pellet screening improvement reported from a new user of Metal 7’s roller screen
July 24, 2007 In June 2006, Metal 7 signed a contract with a foreign client for the supply of six (6) new chain driven roller screens to replace existing roller screens in the balling dept. of an overseas pellet plant. The new units were shipped from Canada per set of two screens in the period between November 2006 and May 2007. The installation program started in February/March 2007 and should be completed around September 2007.
A study was made on the frist roller screen installed and the results are very gratifying for our company.
For More Information: http://www.metal7.com/en/realisations/realisation.asp?no=617
|